Skip to main content
Alto Roofing
A traditional stone slate roof with two white dormer windows and a stone chimney above a rubble stone wall.

Roof repairs on listed buildings and in conservation areas

When a roof repair in Oxford needs listed building consent, planning permission or building control, where to check, and what to sort out before a roofer starts.

I work on period and listed buildings

Photo: Acabashi, CC BY-SA 4.0, via Wikimedia Commons

Is your house listed, or in a conservation area?

Check first, because the rules are different. Every listed building is on the National Heritage List for England, searchable by address. Listing covers the whole building, inside and out, not just the front.

Oxford has 18 conservation areas, including Jericho, Osney Town, Iffley, Old Headington, Headington Quarry, Walton Manor and the North Oxford Victorian Suburb. A house can be in a conservation area without being listed, or be both. Outside the city, ask your district council: South Oxfordshire, Vale of White Horse, Cherwell or West Oxfordshire.

Conservation areas and Article 4 directions in Oxford

In a conservation area, an unlisted house doesn't need listed building consent. Re-roofing like for like usually needs no planning permission either. Changing what the roof looks like is different, and the council expects new work to match.

Some streets have an Article 4 direction, which removes permitted development rights. Oxford has them in Jericho, Osney Town and Wolvercote Green. The Jericho direction covers changes in roofing material, and other alterations to roofs facing a road or waterway, so these need planning permission there. If your street might be covered, ask the council's heritage team (heritage@oxford.gov.uk) before choosing materials.

Planning permission and building regulations for a new roof

The Planning Portal says re-roofing that doesn't materially change how a house looks usually doesn't need planning permission. Flats and maisonettes don't have householder permitted development rights, so check before changing anything.

Building control is a separate test. The Planning Portal says repairs or re-covering normally need no application if less than half the roof, and less than a quarter of the building's whole outer envelope, is affected. Above that, or with a covering 15% or more heavier (concrete tiles in place of slate, say), approval is needed. Listed buildings still need it, but the energy-efficiency rules allow for their character.

Storm damage on a listed roof

If a storm opens up a listed roof, it can be made safe and weathertight straight away. The law allows for urgent work without consent when it's needed for safety or to protect the building, but only the minimum, and you must tell the council in writing, with your reasons, as soon as you reasonably can. A tarpaulin or temporary covering is the usual first step; the permanent repair then follows the normal rules, consent included. I do emergency roof repairs across Oxfordshire. Take photos before anything is touched: they show the council what was there and what was done.

Questions about listed and conservation roofs

Do I need listed building consent to repair my roof?

Can I replace my roof in a conservation area?

Do I need planning permission for a new roof?

Related pages

Talk to me about an old roof

WhatsApp me photos of the roof, or call 07306 077999. I usually come and look the next day, free, so you know what the work involves before you go to the council.

No call-out charge, day or night